Short answer
Sites storing dangerous substances above Schedule 1 thresholds fall under COMAH 2015 (Seveso III): all operators notify and keep a major accident prevention policy; upper-tier sites also need a safety report and an emergency plan tested at least every three years.
Major-hazard chemical sites in Great Britain are regulated by the Control of Major Accident Hazards Regulations 2015 (COMAH), which implement most of the EU Seveso III Directive 2012/18/EU. A site is a lower-tier or upper-tier establishment depending on whether the dangerous substances present reach the thresholds in columns 2 or 3 of Schedule 1. All operators must notify the competent authority and keep a major accident prevention policy; upper-tier operators must also submit a safety report and prepare and test an internal emergency plan.
Short answer
- Law: COMAH 2015 (SI 2015/483), in force since 1 June 2015; in Northern Ireland, the COMAH Regulations (Northern Ireland) 2015.
- Competent authority: HSE (or ONR for nuclear establishments) acting jointly with the Environment Agency in England, Natural Resources Wales or the Scottish Environment Protection Agency.
- All establishments: notification (regulation 6), a written major accident prevention policy (MAPP) implemented by a safety management system and reviewed at least every five years (regulation 7), action after a major accident (regulation 26).
- Upper tier in addition: safety report reviewed at least every five years and after changes (regulations 8 to 10), internal emergency plan reviewed and tested at intervals not exceeding three years (regulation 12), information to people likely to be affected (regulation 18); the local authority prepares and tests an external plan (regulations 13 and 14).
- Charges: the competent authority recovers its costs; HSE lists £218 an hour for COMAH regulatory activity (2026 rates).
- Other laws still apply: HSWA, MHSWR, DSEAR, COSHH and RIDDOR, and land-use planning controls on hazardous substances.
Lower tier and upper tier duties compared
| Duty | Lower tier | Upper tier |
|---|---|---|
| Notify the competent authority before construction and operation | Yes | Yes |
| Major accident prevention policy, reviewed at least every 5 years | Yes | Yes |
| Safety management system | Yes, proportionate | Yes, described in the safety report |
| Safety report, reviewed at least every 5 years and after significant changes or a major accident | No | Yes |
| Internal emergency plan, reviewed and tested at least every 3 years | No | Yes |
| External emergency plan (by the local authority) | No | Yes |
| Public information made available by the competent authority | Yes | Yes, more detailed |
The MAPP must be proportionate to the major accident hazards, set out the operator's aims and principles, and define management's role and commitment to continuous improvement (regulation 7(2)). When preparing the internal emergency plan, the operator must consult the people working at the establishment, the environment agency, the emergency services, the health authority and the local authority (regulation 12(5)).
Enforcement and after a major accident
The competent authority examines safety reports, inspects establishments and must prohibit the operation of any establishment or part of it where the prevention and mitigation measures are seriously deficient (regulation 23). It also identifies domino groups where neighbouring sites can increase each other's risk (regulation 24). After a major accident, the operator must inform the competent authority as soon as practicable and supply the circumstances, the substances involved, the consequence data, the emergency measures taken and the steps to prevent recurrence (regulation 26). Deaths, specified injuries and dangerous occurrences are also reported under RIDDOR.
Example: A distribution terminal increases its storage of a flammable liquid so that the inventory passes the column 3 threshold in Schedule 1. The site changes from lower tier to upper tier, and because the change results from a modification it is treated as a new establishment. Within a reasonable period before the change it must notify the competent authority, review its MAPP and safety management system, prepare a safety report, prepare an internal emergency plan after consulting the workforce and emergency services, and give the local authority the information needed for the external plan. Its DSEAR assessment and zoning must also be updated for the new tanks.
How the UK compares with the EU and Türkiye
COMAH follows the Seveso III structure used across the EU, so tiers, MAPP, safety report and emergency plan requirements are closely aligned. Türkiye applies the same Seveso-based model through its own major industrial accidents regulation (known as BEKRA). For the qualifying quantities, operators must use the Schedule 1 tables in the current UK text rather than EU or Turkish lists.
Common mistakes
- Counting only one tank or one substance. Thresholds apply to the whole establishment, including aggregation rules in Schedule 1.
- Letting the emergency plan test lapse. Upper-tier plans must be reviewed and tested at intervals not exceeding three years.
- Treating COMAH as a substitute for DSEAR. Workplace explosion risks still need a DSEAR assessment and zoning.
Related on excodex
- Occupational safety and health in United Kingdom: law, authorities and employer duties
- Seveso III and major-accident prevention: tiers, MAPP, safety report
- BEKRA: major industrial accidents regulation in Türkiye
- How are explosive atmospheres and Ex equipment regulated in the United Kingdom?
Standards and further reading
- Control of Major Accident Hazards Regulations 2015 (SI 2015/483): https://www.legislation.gov.uk/uksi/2015/483
- Control of Major Accident Hazards Regulations (Northern Ireland) 2015: https://www.legislation.gov.uk/nisr/2015/325
- HSE, Introduction to COMAH: https://www.hse.gov.uk/comah/introduction.htm
- HSE, Fees and charges, current rates: https://www.hse.gov.uk/enforce/charging/rates.htm
- Directive 2012/18/EU (Seveso III) on the control of major-accident hazards involving dangerous substances
This article is general occupational safety and health information prepared by the excodex editorial team. It does not replace the applicable legislation, standards, manufacturers' instructions or the assessment of a competent OSH professional or occupational physician.
More questions on this topic
- What is the main occupational safety and health law in the United Kingdom and who enforces it?
- Must an employer in the United Kingdom appoint a safety professional or an occupational physician?
- Is a written risk assessment mandatory in the United Kingdom, and how often must it be reviewed?
- How and within what time must a workplace accident be reported in the United Kingdom?
- What OSH training must employers provide to workers in the United Kingdom?
- Are pre-employment and periodic medical examinations required for workers in the United Kingdom?
- What are the penalties for breaking occupational safety rules in the United Kingdom?
- Is a safety committee or a worker safety representative required in the United Kingdom?
Part of: Occupational safety and health in United Kingdom: law, authorities and employer duties